Reliance 606 Water Heater Replacement Parts Exploded View Diagram Guide

reliance 606 water heater parts diagram

Locate the anode rod at the top of the tank–typically secured by a hexagonal head bolt. Replace it every 3–5 years to prevent corrosion, especially in hard-water regions where sediment accumulates faster. A magnesium rod lasts ~2 years, while aluminum-zinc alloys extend service up to 5 years. Check local water hardness: over 180 ppm calcium demands annual inspections.

Thermostat calibration often fails silently. The upper and lower controls should read within ±5°F of each other. Use a multimeter set to RX100 to test continuity across terminals–no reading signals a defective unit. Adjust calibration screws incrementally: 1/4 turn clockwise raises temperature ~10°F. Factory settings (120°F) may not match household needs; verify with a calibrated surface thermometer.

Dip tube fractures mimic sediment clogs. Inspect for plastic fragments in drain valve discharges–white or brown particles confirm failure. Polypropylene tubes degrade in temperatures above 140°F; nylon replacements last longer but cost 2x. For models with side-mounted cold inlet, ensure the tube extends to the bottom 1/3 of the vessel or stratification reduces recovery efficiency by 15–20%.

Pressure relief valves demand annual testing. Lift the lever fully, then release–water should discharge forcefully before shutting off. A trickle indicates scaling or wear; replace if flow continues after release. Set tank pressure below 80 psi, or the valve may fail to open during overheating. Use a T&P gauge to confirm–mismatched ratings void warranties.

Burner assemblies collect soot in propane units faster than natural gas. Disassemble every 12 months: brush ports with a 0.014″ wire, vacuum orifices, and check for spider webs in the flue. Yellow flame tips signal incomplete combustion–clean the orifice with 400-grit sandpaper. For electronic ignition, test the igniter electrode gap (0.12–0.16″ for most designs); wider gaps cause intermittent failures.

Drain and flush the tank biannually–hard-water areas require quarterly intervals. Attach a garden hose to the drain valve, run it uphill to create backpressure, and open the valve fully. Sediment ejects faster at 2 GPM; repeat until discharge runs clear. For stubborn buildup, inject white vinegar through the anode port (1:1 ratio with water) and let stand for 4 hours before flushing.

Troubleshooting Your Electric Storage Tank Components

Locate the thermostat access panel behind the lower insulation cover–remove the two screws to expose the upper and lower thermal regulators. Verify voltage with a multimeter: the upper unit should read 240V between terminals 1 and 3 when calling for heat; absence indicates a faulty switch or tripped breaker. Replace the faulty regulator precisely–model 02-008-90 adheres to this series and snaps into the bracket without adhesive.

Anode Rod Inspection Points

reliance 606 water heater parts diagram

Extract the sacrificial anode via the hex-head bolt atop the tank–turn counterclockwise using a 1 1/16″ socket. A rod thinner than ½” diameter or covered in calcium deposits signals imminent failure; magnesium alloy anodes last 4-6 years under hard water conditions, while aluminum lasts 2-3 years. Install a new rod ASAP to prevent tank corrosion–ensure the new unit matches the 3/4″ NPT thread pitch or risk improper sealing.

Pressure relief valves fail silently–test quarterly by lifting the lever to release a brief burst of steam. If no discharge occurs, the valve has sediment blockage or internal corrosion; replace immediately with a model rated 150 psi, 210°F. Always reinstall the discharge tube at a downward angle to direct scalding output safely away from electrical components.

Identify the blower motor by its black plastic housing–disconnect power, remove the rear cover screws, then unplug the two-pin connector. Spin the fan blade by hand; grinding noises indicate worn bearings, while no movement suggests a seized rotor. Order replacement part 03-043-11 precisely–third-party motors lack the thermal cut-off switch integral to this design.

Drain sediments annually via the brass spigot–attach a garden hose, open the valvethen shut off cold inlet to siphon buildup. Heavy debris clogs the heating elements; if resistance drops below 5 ohms, replace the submerged unit with a UL-listed Incoloy version to resist scale accumulation. Always purge air after refilling by opening a hot tap until flow stabilizes.

Finding Components for Your Model-Specific Tank via Serial Identification

Enter the exact serial code from the rating plate–usually fixed on the side or behind an access panel–to access precise replacement schematics. Avoid third-party catalogs; always begin searches on the official manufacturer portal using the full 10–12 digit identifier visible beneath the bar code.

Common errors stem from overlooking suffixes like “R” or numeric revisions (e.g., 606A vs. 606B). Verify this detail first: components for different revisions rarely interchange, even if visual differences appear minor. A quick cross-reference with the build date (month/year) printed next to the serial eliminates mismatches.

Critical Locations for Replacement Components

  • Thermal cutoff switch: Positioned adjacent to upper heating element terminals; requires multimeter resistance check at 25 °C (should read ~0 Ω for intact unit).
  • Dip tube: Inside cold inlet connection; extended immersion models (code suffix “-EX”) feature polybutylene variants vulnerable to brittle fracture after ~12 years.
  • Anode rod: Magnesium-core types demand annual inspection; aluminum-zinc hybrid rods tolerate softer feed liquid but corrode faster in tanks above 65 gallons capacity.

Secure schematics directly through the OEM customer service–request “exploded assembly drawing” rather than general brochures. Files arrive as password-protected PDFs; size typically 1.2–1.8 MB for 300 dpi clarity required during component removal. Verify each drawing against the tank’s physical labeling; mismatched placards (e.g., “Type: L” vs “Type: M”) denote unique gasket and valve requirements.

Secondary vendors often mislabel substitute items–example: a universal thermostat kit might lack the precise thermal curve calibrated for 4500/5500 watt elements. Purchase genuine sub-assemblies whenever tolerance thresholds exceed ±2 °F; replica sensors drift within 12–18 months under cyclic pressure loads (≥250 PSI).

Stepwise Serial Decoding for Maximum Accuracy

  1. Extract eight-digit alphanumeric cluster ignoring prefixes like “MFG” or “PLT.”
  2. Locate two-digit model variant embedded in positions 3–4 (e.g., “06” denotes pressurized pour instantiation).
  3. Convert next two positions to manufacturing week (e.g., “12” = week 12 = March).
  4. Cross-match week number with internal engineering revisions–a June build often includes PSI valve upgrades absent in January versions.
  5. Input full serial into OEM parts lookup; if portal rejects entry, deduce burner orifice size from week-based production batches (small orifice = weeks 1–26, large orifice = weeks 27–52).

Stores specializing in obsolete storage systems maintain microfiche archives containing superseded schematics. Request printouts for 1998–2004 production runs where digitized records are incomplete; these documents reveal obsolete element flange designs (Type-2 copper seal vs Type-3 zinc ring) crucial for leak prevention.

Electronic controls module failure often remains undetected until tripping–measure DC voltage across terminals (expect 5 VDC ±0.2 V); deviations signal corrupted firmware requiring firmware reload sequences detailed in service bulletin #14-606-R3. Avoid generic replacement circuit boards; mismatch in logic gate configuration (NAND vs NOR) risks overheating during standby cycles.

Step-by-Step Guide to Safely Dismantling Your Storage Tank for Component Repair

Cut the power supply at the circuit breaker–label wires if reconnection order isn’t memorized. For gas-powered units, turn the gas valve clockwise until resistance is felt, then bleed residual pressure by opening a nearby hot tap for 30 seconds. Drain the tank completely via the discharge port at the base; connect a garden hose targeting an approved drainage area, ensuring at least 18 inches of fall per 10 feet. Failure to drain fully risks scalding and sediment spillage during disassembly.

Remove the outer jacket by unfastening the top and bottom retaining screws–typically six #8 Phillips-head fasteners. Lift the jacket upward, noting insulation alignment for reassembly. Disconnect thermostat leads using needle-nose pliers, tagging wires with colored tape corresponding to terminal positions. For combustion-chamber models, detach the draft diverter by unscrewing the two 11-mm hex bolts securing the flue collar; store bolts in sequence-labeled zip bags.

Unthread the anode rod using a 1-1/16″ socket wrench–apply penetrating oil if threads seize, but avoid excessive force to prevent bushing damage. Inspect the rod for excessive corrosion; replace if diameter reduction exceeds 25%. Next, extract the upper element flange: loosen the four 3/8″ bolts in a star pattern, then pry gently with a screwdriver between the gasket and tank rim to break vacuum adhesion. Rotate flange counterclockwise until free.

Withdraw the submerged temperature probe by unsnapping its retaining clip, then wiggling the sensor free. Disconnect the lower element assembly by first removing the access panel–held by three 1/4″ screws–and sliding out the wiring harness plug. Use a basin to catch residual flush from the tank’s low point. For recirculation-pump variants, detach the pump mounting bracket by removing two 5/16″ nuts before proceeding.

Clean all disassembled segments with distilled white vinegar, rinsing metal surfaces with deionized water to neutralize acidic residue. Replace gaskets if compression marks disappear or surface irregularities appear. Apply food-grade silicone grease to O-rings before reinstallation, ensuring proper seating without twisting. Verify all electrical connections meet 600V dielectric strength before reconnection.

Reattach components in reverse order, torquing bolts incrementally to manufacturer specifications–upper flange to 25 ft-lbs, element flange to 15 ft-lbs. Refill the unit before energizing, allowing 15 minutes for air displacement at the highest vent. Confirm combustion chamber integrity with a soap-bubble test before reactivating fuel supply; monitor for temperature consistency over 24 hours.