
For precise identification of hydraulic lines on your compact loader, refer to port labels H1, H2, T1, and T2 on the control valve manifold. Incorrect connections lead to system failure–cross-reference with the official schematic before disassembly. The main valve block divides into work circuits (left/right auxiliary) and the loader relief section, regulated by 2,500 PSI springs. Replace worn spools only with OEM-spec components to maintain flow consistency.








